Zhongfu Shares are in hot construction for the second phase project

2022-03-24

Zhongfu Shares are in hot construction for the second phase project!

 

Production for the second phase project is expected to start in June 2022, with an annual output of 2000 tons of hydroflurane, 1000 tons of alkyl iodine, 200 tons of perfluoropolyether, 300 tons of perfluoroalkyl sulfonyl fluoride, 1000 tons of pharmaceutical intermediates, 2000 tons of perfluorohexanone, 2000 tons of hydrofluoric acid fluorinated products, and 100 tons of electrolytic fluorinated products.

 

Warmly welcome all the friends come and give guidance.

image.png

上一篇:Dazhi, 2022

下一篇:On-the-job training